Sunday, June 3, 2012

(05xx2012) Construction

Purpose:

We started the lid construction by modifying pvc pipes and sanding off the edges for fitting. We followed the design as displayed below




Figure 1: Modification on the length of pvc

  • First we modified the pvc by cutting the unwanted parts.




Figure 2: Preparation for the modification





Figure 3: Cutting the PVC




Figure 4: PVC modification





Figure 5: Sanding of PVC

  • We sand the pvc to make sure not to obstruct the fitting 



Figure 6: Sanding of PVC to ensure fitting




Figure 7: Lid Assembly

  • We construct the lid  piping by joining the water piping with a joint that connects to a t-shape pvc


Figure 8: Preliminary testing of Pressure Chamber


  • We test the basic function of the assembly and found that the pvc is water tight but the lid is not



Figure 9: Two meter configuration 


Conclusion:

We have started to modifying the pvc pipe and attached it to the lid assembly. We also tested the integrity of the entire system and found that the pvc is water tight.